AI Hub / WIS / 900 / 1998 / Document 999

WIS Document: 999

Model Context: 900 (1998)

Leaf Node
| | Replacement of secondary air check valve | 1. | Detach the hose connection and remove the valve. | 2. | Fit the check valve. Tightening torque 25 Nm (18.5 lbf ft). | Important | The valve has conical pipe threads. | | 3. | Reconnect the hose.

Canonical Workshop Redirect

For step-by-step instructions, interactive illustrations, and official wiring diagrams, refer to the human-optimized workshop page below.

Switch to Interactive WIS